Historisch Technisches Museum Peenemünde, Germany
WEBMay 29, 2023 · The crane unloaded the Silesian coal from the harbour (or when it was out of order it came from the underground bunker underneath) and fed the crusher house (Brecher Haus) where the coal was refined into smaller pieces (max. 40mm) and was dropped on the conveyorbelt bridge (Schrägaufzug) to be transported into the steam .